From the factory 2 min read

How a DWELLII house is built: a look inside the factory

None of our houses goes up brick by brick on the plot. Each one is built in our own factory, in timber-frame construction, module by module. A look behind the factory doors.

Two employees in the DWELLII factory aligning a timber wall in the wall press
In the factory: a timber wall in the press
50,000 m2
Factory site
50+
People work at DWELLII
2 or 3
Modules per house
1 week
On-site assembly, approx. (based on experience)

When a DWELLII house arrives on the plot, most of the work is already done. That’s because it is built beforehand, in our own factory. On a 50,000 m2 factory site, we build the modules that will later become your house.

The house is completely prefabricated and pre-assembled in our factory, in timber-frame construction.

Mario Beckstein, DWELLII

It all starts with timber

Our houses are built in timber-frame construction: a load-bearing timber frame that is insulated and sheathed. The components are prepared, marked out and cut to size in the factory before they become a wall.

An employee's hand marking a timber component with a red pen
Marking out before cutting

From parts to walls

In the wall press, the timber walls are assembled and aligned. In the factory, all of this happens under cover. The walls then become complete room modules: the TR3M is built in three modules, the smaller houses TR01, TR02 and TR03 in two.

An employee in the DWELLII factory fitting a facade of vertical timber battens to a module
The timber facade goes onto the module in the factory

The facade is rear-ventilated and made of thermally modified timber. Depending on your preference, it is left natural or given a grey treatment in the factory.

Windows and interior fit-out are also completed in the factory, depending on the specification level.

How long does it take?

For us, delivery time and build time are one and the same: while you wait for your house, it is being built in the factory. In our experience, that takes around six months from the building permit. That’s a figure based on experience, not a promise, because the delivery date can only be fixed precisely once the building permit has been granted.

Good to know

In the meantime, the foundation and utility connections are prepared on site. We support you with all the plans and information you need and can recommend partner companies.

And then it all happens very fast

Once the foundation is ready, the modules are transported to the plot and lifted into place by crane. On site they are joined together; assembly takes about a week (based on experience, not a promise). After that, the electrician and plumber connect the utilities.

When the house is delivered, everything happens very fast.

Mario Beckstein, DWELLII

You can see what the finished result looks like in the TR3M show house in Bad Vilbel. Come along and see what comes out of our factory.

02Show house

Fancy seeing it for yourself?

The TR3M show house is in Bad Vilbel, open Wednesday to Sunday from 11 am to 6 pm. Drop in without booking, or register in advance and get free entry to the show house park.

03Magazine

Also worth a read

  • TR3M show house on a single level: timber façade, large windows and a wooden terrace in front

    Bungalow & living in later life

    Bungalow or two storeys: what really matters as you age

    Eight in ten households with people aged 65+ have no step-free access to their own home. Why the question of stairs comes up sooner than many people think.

    4 min read

  • Living and dining area in the TR3M show house with wooden table, armchairs and large windows onto the terrace

    Fittings & makers

    Advertisement Advertisement: DWELLII is a sales partner of Ethnicraft

    Furniture made to stay: a portrait of Ethnicraft

    A house only becomes a home when the furniture is right. Ethnicraft from Belgium makes solid wood furniture, and you can order it together with your DWELLII house.

    4 min read

All articles in the Magazine